CICustom Integration
Start coordination

Engineered drawings · CAD coordination

Every location,
resolved before site.

We turn architectural backgrounds into coordinated technology drawings—placing, identifying and connecting every system before construction decisions become expensive.

Build the drawing
PROCESS WALK-THROUGH · INTENT / STARTING CONDITION01 / 04

INTENT / STARTING CONDITION · Engineered drawing workflow · Brief

Start with rooms, rituals and constraints.

The project team aligns the homeowner experience with architecture, structure, ceilings, finishes and equipment space.

Final pathways and documentation are field-verified.
A guided engineering story0:49

Make every relationship visible

Listen to the idea unfold in a calm, guided story.

0:000:49
Read the transcript

Whether the home exists only on a floor plan, or has been lived in for years, our first job is the same: make every relationship visible. On a new project, we build the drawing layer by layer—speakers, cameras, keypads, access points, pathways, and rack positions—so decisions are coordinated before finishes. In an existing system, we work backward. We trace cables, ports, IP addresses, MAC identities, drivers, and Scenes, until the residence becomes a map instead of a mystery. Then we correct the smallest proven fault, and record the result. The homeowner is no longer relying on somebody’s memory. The home has a clear, supportable story.

Ready to play

From background to issued set

Watch the engineering layers assemble.

Walls, doors, room names and reflected-ceiling geometry establish the coordinated base.

CUSTOM INTEGRATION · ENGINEERED SYSTEMSA-LOW-101 · LEVEL 01
GREAT ROOM
KITCHEN
DINING
OFFICE
GALLERY
MUDROOM
N ↑
LLKKSSCCAAVN
TR-01CENTRAL RACK
SYSTEM LEGENDLighting controlSecuritySurveillanceMusic / AVBVideo / SDVoENetwork
DEVICE SCHEDULEID   QTY  DESCRIPTIONLT   08   LIGHTINGSEC  12   SECURITYCAM  06   SURVEILLANCESPK  14   AUDIOVID  05   VIDEOWAP  04   NETWORK
REVISION03 · ISSUED FOR COORDINATION23 JUL 2026

A drawing set the field can use

Design intent becomes installation certainty.

  1. Floor plans

    Device symbols, identifiers, mounting locations and home-run relationships coordinated room by room.

  2. Reflected ceilings

    Speakers, access points, cameras, sensors and lighting elements aligned with ceiling architecture.

  3. Rack elevations

    Equipment position, thermal planning, patching and signal flow arranged before fabrication.

  4. Details

    Backboxes, recessed assemblies, keypad alignments and installation conditions clarified at larger scale.

  5. Schedules

    Device counts, cable types, mounting data, addressing and specification references linked to plan tags.

  6. As-builts

    Field changes, test results and final pathways captured for service, renovation and future expansion.

ARCHITECTTECHNOLOGY DESIGNERBUILDERFIELD TEAM

One coordinated source of truth.

Revision-controlled information connects the design meeting, the construction set, the wire pull and the final as-built record.

Coordinate a project