CICustom Integration
Plan a prewire

Whole-home infrastructure · before the walls close

The home begins
behind the walls.

A visual journey through centralized prewire for lighting, security, surveillance, music, video and networking—from the first pathway to the final test.

Follow the wire
06 SYSTEMS01 CENTRAL CORE100% DOCUMENTED
PROCESS WALK-THROUGH · INTENT / STARTING CONDITION01 / 04

INTENT / STARTING CONDITION · Centralized prewire · Central plan

One core. Every future room.

The equipment room, pathways, separation and cable schedule are resolved while the framing is still open.

Final pathways and documentation are field-verified.
A guided construction story0:46

The path behind the walls

Listen to the idea unfold in a calm, guided story.

0:000:46
Read the transcript

Before this room is finished, every future experience has to find a path. Lighting control, security, cameras, music, video, and the network leave the central rack on their own labelled routes—supported and separated before the walls close. In a new build, we can plan conduit and access for what the home may need years from now. In a finished residence, the work becomes quieter and more surgical. Survey the attic and crawl space. Use existing openings. Fish the cable. Make only the access the route requires. Then test, patch, and paint, until the room feels whole again. The wire disappears. The record of where it went does not.

Ready to play

New construction

Structure creates the opportunity.

Before insulation and drywall, every destination is accessible. This is the moment to create orderly, replaceable pathways—not merely enough cable for today.

NEW CONSTRUCTIONCENTRALIZED HOME-RUN ARCHITECTURE
01

Coordinate

Architectural, electrical, millwork, reflected-ceiling and landscape plans are reviewed as one system.

02

Build pathways

Conduit, sleeves, backboxes, risers and accessible routes preserve options through the life of the home.

03

Home-run

Each cable returns to the central equipment room—supported, separated, labelled and protected.

04

Capture

Testing, photographs and as-built records document what will soon disappear behind finishes.

New construction flow-through

Every signal has a planned path.

03 / 05ENGINEERING RESPONSE · ROUTE + SEPARATE

Cable pull

System-specific cable is pulled home-run to a central location, supported, separated and labelled at both ends.

SIGNAL MOVING
CENTRALRACK
01LightingSavant keypads · panels · fixtures
02SecurityELK · DSC · Alula · contacts
03SurveillanceCameras · recording · analytics
04MusicAVB · amplifiers · speakers
05VideoSDVoE · displays · sources
06Network10GbE · Wi-Fi · data outlets
Control Audio Video Data

One core, distinct signal paths

Each system gets what it needs.

  1. Savant lightingLighting

    Control bus · keypad wire · fixture control · shade power

  2. ELK · DSC · AlulaSecurity

    Door & window contacts · motion · glass · life safety

  3. PoE videoSurveillance

    Category cable · camera positions · secure recording

  4. AVB audioMusic

    Speaker cable · category cable · local source return

  5. SDVoE videoVideo

    Category cable · fiber/conduit · display & source locations

  6. 10GbE · Wi-FiNetwork

    Category cable · fiber · access points · outdoor coverage

A finished mansion, carefully modernized

Find the hidden route before opening the wall.

Retrofit work starts with investigation. Attics, crawl spaces, closets, millwork, mechanical chases and existing openings are mapped first so new wire can travel with the least possible impact.

The complete retrofit cycle

The wall returns to finished.

BEFORE · PRESERVE THE FINISHED ROOM

Floors, furnishings and the work zone are isolated before any access is created.

01Protect
FISH TAPEPATCH BOARDCOLOUR MATCH
01

Attic routes

Top plates are approached from above, then wire is lowered through carefully selected wall cavities.

02

Crawl spaces

Open framing below can carry protected runs upward through bottom plates and cabinetry.

03

Pot-light openings

Existing recessed-light apertures create strategic handoff points without broad ceiling removal.

04

Closets & millwork

Low-visibility vertical chases can bridge floors while keeping disruption away from finished rooms.

05

Controlled openings

When access is unavoidable, small planned openings are cut, protected and prepared for professional repair.

Plan early · document everything · preserve the architecture

The best wire is the wire
you never need to see.